Southwest Ranches, Florida · locally owned

Level is safe. Dry is sound.

Water sits where the plane falls away. Footing moves where the base is wrong. We measure the ring first, then regrade the material already there to a true plane.

We are based right here in Southwest Ranches, so same-day site visits are usually no problem.

1 to 2

days on site

1/4 in

finished plane

0

items in ring

Ring estimate

Measure the ring

Existing material

Ring total

$2,800

Ring area

20,000 sf

This estimate is for a regrade using the material already in the ring. If the base is the problem or more sand is needed, we will price that after the site visit.

Book a grade report

The cut

Scroll to take the ring to plane.

Deviation across the ring

2.90in

Out of tolerance

+6+2-2-6FOOTINGBASELASER REFERENCE PLANELANDS INTO A DIPTAKES OFF A CROWNEVEN TAKE-OFF AND LANDING
0 ft120240 ft
  1. 01

    Reference

    The laser turns one true plane over the whole ring. Every reading afterwards is measured against it, not eyeballed.

  2. 02

    Cut

    The blade shaves the crowns down to that plane, working the ring left to right in a single pass pattern.

  3. 03

    Fill

    The material comes off the high spots and goes into the low ones, so the water that used to sit there has nowhere to collect.

  4. 04

    Ride

    Take-off and landing read the same depth. The horse gets the same footing in every corner of the ring.

On an uneven ring the horse takes off from a high spot and lands in a soft dip, so the stride shortens and the leg takes the shock.

The diagnosis

Your ring is out of plane.

A finished equestrian arena surface viewed across its full plane

A base built flat, a corner that took traffic, or a season of rain can move the plane. The footing follows it. The result is standing water, uneven depth, and a different surface at every stride.

The work

Shot once. Graded to the report.

01

Clear the ring

Remove jumps, drag equipment, and every loose item before the crew arrives.

02

Measure and regrade

We shoot the existing plane, set the target, then cut and fill the footing to grade.

03

Review the surface

The finished plane is checked against the target before the ring returns to work.

Service area

A local crew, on your ring fast.

GradeMyArena works out of Southwest Ranches, Florida, and our crews travel as far as Wellington and Jupiter. Request before midday and we can often be on your ring the same day.

Once we have measured, the regrade itself takes 1 to 2 days on site.

  • Southwest Ranches
  • Davie
  • Cooper City
  • Weston
  • Pembroke Pines
  • Miramar
  • Plantation
  • Sunrise
  • Hollywood
  • Wellington
  • Jupiter

Barns outside these towns are welcome too. Ask and we will confirm the visit window.

Booking

Book the grade report.

Choose a preferred date. Same-day visits are often available across Southwest Ranches and nearby towns; otherwise we confirm the 1 to 2 day work window within one business day.

Ring total

$2,800

200x100 ft
20,000 sf

This quote uses the existing ring material. Added sand, base correction, and replacement footing are separate work. We discuss those after the visit. The ring must be empty before grading starts.

No payment is taken when you request a date.